Finished runner: mint green and white chevron stripes, about 12 in wide x 36 in long.
| Finished size | Approx. 12 in (30 cm) wide x 36 in (91 cm) long, not including the border |
| Difficulty | Easy — only chain, double crochet and single crochet |
| Hook | 4.5 mm |
| Yarn | DK / light worsted cotton or acrylic — mint green approx. 200 g (400 m), white approx. 150 g (300 m) |
| Time | Approx. 6–8 hours |
This is an original pattern guide written from the chevron stitch. Your finished size may vary a little with your yarn, hook and tension — that is normal. Measure as you go and add or remove rows to fit your table.
Materials:
You will need:
• Mint green yarn — DK / light worsted weight, approx. 200 g (400 m). Cotton gives a crisp drape; acrylic is fine too.
• White yarn — same weight as the mint, approx. 150 g (300 m).
• Crochet hook — 4.5 mm.
• Yarn needle — for weaving in ends.
• Scissors and a tape measure.
• Stitch markers (optional) — handy for marking the first peak and valley of each row.
Gauge
18 dc and 8 rows = 4 in (10 cm) in chevron pattern, using a 4.5 mm hook. Gauge is not critical for a table runner — if your runner comes out a little wider or narrower, it will still look lovely. For an exact 12 in width, adjust your hook size up or down.
Abbreviations (US terms)
| ch | chain | dc | double crochet |
| sc | single crochet | st(s) | stitch(es) |
| rep | repeat | sk | skip |
| RS / WS | right side / wrong side | sc2tog | single crochet 2 together (decrease) |
How the chevron works: each wave is 13 stitches — 5 dc up the slope, 3 dc in one stitch to make the peak, 5 dc down the slope, then skip 2 stitches to make the valley. The peaks and valleys line up row after row, so the zigzag stays straight. The runner is 4 waves wide (52 stitches).
The Pattern
Work in rows, turning at the end of each row. The turning chain (ch 3) counts as the first dc of the row. Change colour every 2 rows: 2 rows mint, 2 rows white, and so on. Carry the unused yarn loosely up the side or cut and weave in the ends — cutting gives the neatest edge.
Foundation row
With mint green, ch 53.
Row 1 (RS): Dc in 4th ch from hook (the skipped 3 ch count as the first dc), dc in next 4 ch — 5 dc at the start. *3 dc in next ch (first peak made), dc in next 5 ch, sk 2 ch (first valley made), dc in next 5 ch; rep from * 2 more times. 3 dc in next ch, dc in last 5 ch. Turn. (52 dc)
Check your count: 5 + (13 x 3) + 8 = 52 stitches. If your count is off, recount the peaks — there should be 4 peaks (each 3 dc in one stitch) and 3 valleys (each sk 2) across the row.
Row 2 — the chevron row
Row 2: Ch 3 (counts as dc), dc in next 4 sts — 5 dc at the start. *3 dc in next st (peak), dc in next 5 sts, sk 2 sts (valley), dc in next 5 sts; rep from * 2 more times. 3 dc in next st, dc in last 5 sts. Turn. (52 dc)
The peaks sit directly above the peaks below, and the valleys sit above the valleys — that is how you know you are on track. If a peak lands one stitch off, you have gained or lost a stitch; count back to the last valley and fix it before going on.
Stripe sequence
Repeat Row 2 for the whole runner, changing colour every 2 rows:
| Rows | Colour |
| Rows 1–2 | Mint green |
| Rows 3–4 | White |
| Rows 5–6 | Mint green |
| Rows 7–8 | White |
| …and so on | Keep alternating every 2 rows |
Working the Length
Keep repeating Row 2 and changing colour every 2 rows until the runner measures about 35 in (89 cm) long, ending with 2 rows of mint green so both ends match. That is about 70 rows in total — count your stripes, not just your rows: 35 stripes of 2 rows. If your table is longer or shorter, simply work more or fewer 2-row stripes.
A quick check every few stripes: lay the runner flat and measure across the middle. It should stay about 12 in wide. If the edges start to pull in, your tension has tightened — relax your hands for a few rows. If the edges flare out, you may have added a stitch at a valley; count the row (it must be 52) and correct it.
Border
The border frames the chevron points and stops the edges curling. Join white with a slip stitch at any corner on the RS.
Border Round 1: Ch 1, sc in each st along the long side. At each corner work 3 sc in the corner st. Along each short end (the zigzag edge), sc in each st across, working 3 sc in the tip of each peak and sk 1 st at the bottom of each valley so the border follows the zigzag instead of puckering. Join with a slip stitch to the first sc.
Border Round 2: Ch 1, sc in each sc around, working 3 sc in the middle sc of each 3-sc corner group and at each peak tip, and sk 1 st at each valley. Join, fasten off and weave in all ends.
Tip: if the short zigzag ends ripple or cup, you have too many border stitches there — skip an extra stitch at each valley on the next round. If they pull tight, add one stitch at each peak tip.
Finishing, Care & Troubleshooting
Finishing and blocking
Weave in every end with the yarn needle, following the stitch path for about 2 in so the ends cannot work loose. Then block the runner: lay it flat on a towel, pin the long sides straight and pin each chevron point out to a sharp tip, mist lightly with water (or steam gently — do not press the iron onto acrylic), and leave it to dry completely. Blocking is what makes the zigzag crisp and the runner lie flat on the table.
Care
• Machine wash cold on a gentle cycle, or hand wash in cool water.
• Dry flat — do not hang, or the runner will stretch out of shape.
• Do not bleach. If the white stripes pick up a stain, soak briefly in cool water with a little mild detergent.
• Store folded, not rolled tightly, so the chevron points keep their shape.
Troubleshooting
• Edges slanting? You are adding or losing a stitch at the turning chain. The ch 3 counts as a dc — make sure you work the last dc of each row into the top of the turning chain of the row below. • Peaks leaning to one side? The 3 dc of a peak must all go into the same stitch — the middle dc of the peak below. Count 5 dc between peaks.
• Valleys disappearing? Check you are skipping exactly 2 stitches at every valley. Skipping 1 makes the zigzag drift.
• Runner wider at one end? Tension changes as you relax into the work. Measure every 10 rows and keep your stitch height even.
• Colour change leaving a hole? Join the new colour in the last yarn-over of the last stitch of the old colour, and carry the tail along the edge for the first few stitches.